We had three loads of 2" cinders and three loads of base coarse gravel delivered to the site. The cinders will be used to level the grade and absorb all that fine volcanic "soil," and the gravel will be used under the house and sheer wall foundations and under the water catchment tank.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment